Final acceptance orchestrator. Verifies that completed work satisfies its contracts and tests before the task is considered done. Enforces triple consistency across CODEMANIFEST, implementation, and .usages/*.md.
Synopsis
/goga:accept [<target>]
<target> is optional. When omitted, the skill determines scope from git diff (branch changes) or asks via AskUserQuestion (specific functionality / branch changes / all project cells).
When provided, <target> is a functionality description or path — free-text that the scope resolver matches to cells in the project schema. For example, auth, goga/ast/nodes, or a short phrase describing the feature.
Examples in this document use Claude Code style (/goga:<command>). For other agents, invoke the skill directly: goga-accept.
Output artifact
A Final Acceptance Report with a verdict:
- ACCEPTED — all steps passed, test coverage ADEQUATE or above.
- ACCEPTED_WITH_NOTES — WARNING/INFO findings that do not block acceptance.
- REJECTED — CRITICAL findings or CRITICAL coverage gaps.
Context initialization
| Step | Action |
|---|---|
| 1 | Load goga-cell — to understand CODEMANIFEST structure and DSL syntax. |
| 2 | Load goga-cookbook — to apply DSL principles. |
| 3 | Load goga-lang-disp — to apply language conventions. |
| 4 | Run goga schema. |
| 5 | Load goga-codemanifest-base — for base usages and annotations. |
| 6 | Proceed to Pipeline Step 1. |
Pipeline
Execute steps strictly sequentially. Each step produces complete output before the next begins.
Step 1. Scope definition (goga-accept-scope)
Define the set of cells associated with the functionality. Scope is resolved in priority order:
- Arguments contain a functionality description or path — use as
<target>and match to cells in the schema. - Arguments are empty — analyze
git diffto identify changed files and map them to cells. - No changes found or scope is ambiguous — prompt the user via
AskUserQuestion: - Branch changes — determine from
git diff. - Specific functionality — user provides a description.
- All project cells — full acceptance.
| Sub-step | Action |
|---|---|
| Resolve scope | Apply the priority order above. |
| Map scope to cells | Run goga schema; match description/diff to cells; for each matched cell verify CODEMANIFEST exists and .usages/ exists; classify change types (CODE / MANIFEST / USAGE / TEST); discover dependent cells (DIRECT or TRANSITIVE). |
Output: Acceptance Scope Report. STOP if no cells discovered, a cell lacks CODEMANIFEST, or scope ambiguous.
Step 2. CODEMANIFEST review (goga-accept-manifest-review)
Verify each cell's CODEMANIFEST against its implementation.
| Sub-step | Action |
|---|---|
| 1. Load context | Load Scope Report; load goga-lang-disp, goga-cell, goga-cookbook, goga-codemanifest-base. |
| 2. Pre-flight check | Run goga lint. Errors → CRITICAL; resolve before proceeding. |
| 3. Per-cell review | For each cell: read CODEMANIFEST; parse entities/methods/properties/imports/usages/annotations/locations; enumerate source files; read every source file at its declared location; verify facade exists. Run goga contract <cell-path>. For each Entity: compare constructor signature, methods, properties. For each Routine: compare signature. Identify undocumented entities, inaccurate signatures, behavioral mismatches. Update CODEMANIFEST where the contract is wrong; record unresolvable discrepancies. |
Output: Manifest Review Report. STOP on unresolvable inconsistency.
Step 3. Usages review (goga-accept-usage-review)
Validate cell-level usage files against actual implementation.
| Sub-step | Action |
|---|---|
| 1. Load context | Load Scope Report; for each cell load CODEMANIFEST, implementation files, cell-level usages (<cell_path>/.usages/*.md), project usages referenced via Usages. |
| 2. Analyze cell-level usages | For each file: example validity, description accuracy, entity name alignment with CODEMANIFEST signatures, coverage completeness, self-sufficiency (no need to read source), no duplication of CODEMANIFEST annotations. Update discrepancies. |
| 3. Analyze project usages | For each referenced project usage: example validity, API coverage, description accuracy. Record remarks without modifying the file. |
| 4. Validate updates | Re-run checks after edits. |
Output: Usage Review Report. STOP on unresolvable inconsistency.
Step 4. Test coverage assessment (goga-accept-test-assessment)
Evaluate test coverage of cells.
| Sub-step | Action |
|---|---|
| 1. Context loading | Load Scope Report; for each cell load CODEMANIFEST, implementation files, existing tests. |
| 2. Coverage point identification | For each cell: contract points (signatures, guarantees, behavior), branch points (conditionals, error handling), integration points (cross-cell calls, side effects), boundary points (empty/nil/edge cases). |
| 3. Test analysis | Enumerate tests; classify as CONTRACT or INTEGRATION; for each coverage point determine whether covered, by which test, and how thoroughly. |
| 4. Coverage verdict | EXCELLENT / ADEQUATE / INSUFFICIENT / CRITICAL_GAPS. |
Output: Test Assessment Report. STOP on critical coverage gaps in changed behavior.
Step 5. Acceptance report (goga-accept-report)
Synthesize the Final Acceptance Report from all preceding outputs.
| Section | Content |
|---|---|
| Summary | One paragraph: what was verified and the overall result. |
| Acceptance Scope | Table of verified cells and change types. |
| CODEMANIFEST Status | CONSISTENT / INCONSISTENT + number of updates. |
| Usages Status | CONSISTENT / INCONSISTENT + number of updates. |
| Test Coverage Assessment | EXCELLENT / ADEQUATE / INSUFFICIENT / CRITICAL_GAPS + summary. |
| Critical Findings | Table: source / finding / status (fixed/open). |
| Warnings | Table: source / finding / recommendation. |
| Applied Updates | List of files modified during acceptance. |
| Risks | Table: risk / severity / mitigation. |
Determine the verdict: ACCEPTED / ACCEPTED_WITH_NOTES / REJECTED.
Stop conditions
The pipeline halts on any of:
- No cells detected in scope.
- Unresolvable manifest-implementation inconsistency.
- Unresolvable usage-implementation inconsistency.
- Critical coverage gaps in changed behavior.
- Any output section left empty.
Each stop produces a structured report explaining what to fix.
When to use
- At the end of the full cycle, after the build-test-change loop converges.
- At the end of the Propose → Change shortcut.
- Optionally, after a standalone
change— when formal sign-off on a fix is desired.
Inputs and outputs
| Input | Completed implementation with reconciled contracts and usages |
| Output | Final Acceptance Report with verdict |
What happens next
- If
acceptpasses — the task is complete; merge, deploy, or move on. - If